Buckner Heavylift Cranes Request A Quote From Buckner Steel Erection
About Buckner Heavylift Crane Buckner Projects Buckner Equipment List Buckner News Equipment For Sale Links Jobs at Buckner
Client Login
User Name
 
Password
 
Forgot Password?
Register Now

 

Raleigh Durham Airport - Terminal C

The project requires 10,000 tons of structural steel, of which custom built-up boxes and shapes, and 66 roof trusses consisting of a combination of steel with laminated wood and a steel cable system, the longest truss having a span of 430 feet (131 meters). The roof structure will be exposed to view as part of the terminal design.

  Image 1 of 4  




A draft of the terminal upon completion.
Site Map Privacy Policy